Toronto Hydro Restoration Work – Bremner Blvd (Spadina Ave to Rees St)

Work is being done on behalf of Toronto Hydro and will be carrying out restoration work from March 30 to April 30 along Bremner Boulevard, between Spadina Avenue and Rees Street. The work will be conducted on a 24-hour basis.

The work area is highlighted in the figure below based on the attached as-built drawings and Traffic Management Plan.